Work breakdown structure (WBS) development for underground construction Elnaz Siami-Irdemoosaa,⁎, Saeid R. Dindarloob, Mostafa Sharifzadehc a Department of Geosciences and Geological and Petroleum Engineering, Missouri University of Science and Technology, Rolla, MO 65401, USA b Department of Mining and Nuclear Engineering, Missouri University of Science …


Shaft sinking and quality control management: Project management, management and control of the overall plot plan, civil, mechanical and electrical design, process flow diagrams for the provision of potable, fire and service water, SLD for electrical reticulation, detailed engineering drawings and layouts ... Work Breakdown Structure (WBS) and ...


Table 1 provides the excavation cycle in terms of a work breakdown structure, that is, how the work was broken down into work packages (operations) and tasks as follows. (a) Drill and blast: (1) preparation, (2) cleanup, (3) drilling blast holes using shaft jumbo, (4) blasting (includes placing explosives) and ventilation after blasting.


"We have recently purchased a $65,000 computerized package for planning and controlling. It is going to take us quite a while to educate our people. In order to interface with the computer package, we must use a work breakdown structure. This is an entirely new concept for our people." "We have a lack of team spirit in the organization.


The shaft structure should be supported in the same way as for the tunnel opening. Special care should be taken at the time of breaking out, this is due to the disturbance of the ground by the sinking of the shaft. Thus, immediate close support of all grounds should be essential.


7 – The well/borehole will be disinfected. Chlorination is the most common method of disinfection undertaken. 8 – Post chlorination the well/borehole will need to be dewatered. The water will be tested until chlorine levels are back below 0.5mg per litre. 9 – …


The work breakdown structure is the tool used to divide the project work content among individ-uals and organizations so that ef ciency and effectiveness will be achieved while ensuring the inte-gration of work efforts to produce the project-required deliverables. 1.5. The Matrix Structure


Chapter 1 5 1.1.3.2 Placer mining Placer mining is used when the metal of interest is associated with sediment in a stream bed or floodplain.


Expanded Work Breakdown Structure Weight Classification Guidance Revision Letter 2 Prepared by Government - Industry Workshop Society of Allied Weight Engineers, Inc. All SAWE technical reports, including standards applied and practices recommended, are advisory only. Their use by anyone engaged in industry or trade is entirely voluntary.


Work done = 9.8N x 36.4m = 357Nm. Since this amount of work is done each second, Power = work/sec = 357Nm/s or watts (W) 356/0.75 pump efficiency = 475W input required by pump . 475/0.85 motor efficiency = 560W input to motor . 560/220V = 2.5 amp running current, which gives: 2.5 x 2 = 5 amp starting current. Summary of Requirements


not tend to build sinking layers. The green waste must be split. If it is mixed with huge allotments, then it will threat the digester wi th blockage. Generally, there are several designs of Indian digesters, thereof: floating gas holder type biogas plant (KVIC model), Deenbandhu model, and Pragati model. The KVIC model is composite unit of a ...


Get More Information

Légis Québec

During shaft sinking or development work, where there is no emergency exit and the motorized device for the transport of persons described in section 53 in out of service, all persons located underground shall be evacuated immediately except the worker responsible for …


Try to structure your work breakdown structure to match the sequence of work as you plan to execute it. For example, look at the Tunneling Project WBS example above. If I was to plan to work first at Shaft S2, then at S1, followed by S3, I would order my WBS to match this sequence. Remember, you're not the only person who will use your schedule.


2013, followed by the North Shaft pre sink in June 2013. Both of these pours lasted approximately one week. Lafarge began supplying high early, high slump concrete for mine shaft liner in September 2013 and began providing 24/7 coverage to support the shaft sinking operations.


Get More Information

WBS: 2.1 TITLE: Systems

PROPOSED NNWSI PROJECT WORK BREAKDOWN STRUCTURE DICTIONARY DRAFT 20-May-85 WBS: 2.1.3 TITLE: Technical Data Base Management OBJECTIVE: To manage and accumulate data on the geometric, geologic, hydrologic, thermomechanical, and geochemical features and properties of the Yucca Mountain site. DESCRIPTION OF WORK: All efforts …


Final Combined Uniformat II / WBS 9/18/06, Revision 2 Unf L1 Unf L2 Unf L3 WBS L4 Definition E UOM M UOM Quantity Definition B101007 FLOOR RACEWAY SYSTEMS SF M2 Gross floor area Under floor or in-slab conduit including conduit and all associated devices.


Get More Information

•Planning with Precision: Planning the resources, processes, work breakdown structure identifying the tasks and activities within the process, and defining up-front what success will look like. • Safety First: Ensuring a safe and Healthy work environment and a zero ... using Vertical Shaft Sinking Machine, Manual Sinking, Diaphragm Walls ...


Project Cost Estimating Manual Work Breakdown Structure – Construction Activities Page 9 of 39 Annexure C August 2007 WORK BREAKDOWN STRUCTURE – CONSTRUCTION ACTIVITIES Level 1 Level 2 Level 3 2781 Design of Reinforced Soil Structure, [structure number] 2782 Reinforced Soil Structure materials, [structure number]


The floor is cracked and sinking to the outside. The outside wall shows signs of settling. This means helical piers are the primary repair you need. A combined wall and floor allows piers to stabilize both the wall and the floor at the same time. In the picture on the right, you can see the outside of the garage has a classic stair-step crack ...


Work Breakdown Structure. Next, we shall create the WBS. Before to start inserting activities and activity relationships in this sample project for construction, you need to create a Work Breakdown Structure (WBS) in Primavera P6. While creating the WBS, keep in mind the key project deliverables.


The Work Breakdown Structure (WBS) is a convenient method for the division of the engineering project into tractable, small work packages, tasks or activities. Essentially, it is a methodology of project organization, planning, and control based on deliverables, rather than simply on tasks or activities of proper organization.


Shaft Sinking and Mining Contractors Conference 2009 P N Lategan _____ Page 3 Due to the integration ability of all Microsoft Office Packages, Microsoft Project can export data to Microsoft Visio2 to automatically generate a hierarchical WBS structure (based on levels). Figure 1 shows an example of such an export. Figure 2


5.02 Date of Commencement & Completion of Work 51 5.03 Programme & Progress of Work 52 5.04 Construction Surveys 53 5.05 Setting out 53 5.06 Increased or Decreased Quantities 53-54 5.07 Omitted Items 54 5.08 Extra, Excess and Substituted Items of Works and Repeat Orders 54-55 5.09 Rate for Extra Work 56 5.09.1 Part Rate 56


The work carried out for the FS is the basis for submitting plans for all permits required to obtain a licence to start mining. ... the shaft can continue sinking while the plant is …


Responsible for generating a Work Breakdown Structure (WBS), allocate budgets at appropriate levels as per project coding structure. Develop an implementation of project ... Was responsible for cost analysis on the Murray & Roberts Cementation shaft sinking contract (2 Vertical and 1 Decline shaft system). Was a member of the review team ...


Apr 2014 - Mar 20151 year. Rajasthan, India. Project: Shaft Sinking project. Project Description: a) Construction of one 7.5 m finished dia and 950 m deep rock and material handling shaft, capable of handling 3.5 MTPA rock. b) Sinking of lining of two 7.5 m finished dia and 500 m depth ventilation shafts for proper ventilation of 3.5 Mtpa mine.


Work breakdown structure compiled Establish tools and equipment required Risk assessment drawn up Procedure drawn up ... Plan view of sinking shaft below 132 level Kibble Compartment Dual Purpose Winder Compartments. Shaft Plugs Decked off with 9"x 3" …


The work reported here was conducted under Work Breakdown Structure (WBS) element 1.2.1.4.7. ii. ... the mucking operation associated with sinking of shafts and driving of drifts. ... from the shaft centerline and for times up to i000 years. The steady-state


has not created that sheet. Generating Report Summary is a tedious work of Linking of cells and sheets. All this hassle is eliminated with the use of RATE-ANLY software. The software is menu driven and easy to use. Methodology List of Items involved in the project is first created. Program has a facility of description (255 char) and


The work breakdown structure in project management is a powerful reference tool that, as the name implies, breaks the work of the project down in terms of scope. It creates a road map from objectives to outcomes. The project is divided up into project deliverables, from which all work-related activities branch out and budgets are derived.


Get More Information

FORGING - Stanford University

for work in cold state there are increasingly used steels of higher strength as e.g. 5% Cr-Mo ... after the roughing is to obtain the desired mechanical properties and a fine structure of the forging. 2.2 Japan Casting & Forging Corporation (JCFC) Together with the Kobe Steel they have expanded on the market with heavy forgings. The


The Shard. The Shard (London Bridge Tower) is London's tallest building (2016), a tapering glass spire that reflects the city's changing skyscape. It is located on a brownfield site at London Bridge railway station, and was designed as an energy efficient "vertical city" for up to 8,000 people. Its creation benefited from innovative ...


The Performance Technical Specifications (PTS) are organized to Level Two of the Uniformat II/Work Breakdown Structure (WBS). Within that structure, the information on particular subsystems is referenced through Level Three and Level Four WBS codes. The Uniformat II/WBS was selected as the organizational structure for a number of reasons.


Get More Information

CHAPTER 3 PROJECT PLANNING

3.2.1 Work Breakdown Structure (WBS) The WBS is described as a hierarchical structure which is designed to logically sub-divide all the work-elements of the project into a graphical presentation. The full scope of work for the project is placed at the top of the diagram, and then sub-divided smaller


the work are listed and grouped into a work breakdown structure. The logical dependencies. between tasks are defined using an activity network diagram that enables identification of the.